Skip to main content
01 // RISK & COMPLIANCE4 DIRECTIVES
CRITICALEnforcement Q2 2027

Mandatory Thermoset GFRP/CFRP Recycling & Scrap Reclamation Quota

Establish verified scrap reclamation streams for dry fiber offcuts and cured structural trim with qualified mechanical or solvolysis recyclers.

WATCHAudit Window Active

Automated Out-Time & Freezer Cold-Chain Traceability Mandates

Deploy automated RFID roll-stock tracking on automated ply cutting tables to guarantee automated expiry lockout before nesting.

WATCHStrict RVC Enforcement

75% Regional Value Content (RVC) Verification for Nearshored Auto Trim

Verify Tier-2 sub-component origin documentation for seat perforations, technical lamination, and foam backing.

ADVISORYDual-Use Regulatory Review

Export Licensing Compliance for High-Modulus Carbon Fiber Precursors

Maintain minimum 60-day safety stock of aerospace-grade roving; certify commercial civilian end-use declarations in advance.

  1. JEC Group Composites News78

    EU Commission Adopts BEU06 to Simplify Cross-Border Shipments of Composite Waste for Recycling

    The European Commission adopted a delegated regulation on 26 October 2026 adding BEU06 to Annex IIIB of Regulation (EU) 2024/1157, allowing non-hazardous fibre-reinforced polymer composite waste destined for recycling to use the green-list shipment regime.

    Manufacturing & Process Note: The BEU06 green-list entry reduces administrative lead times for cross-border composite scrap, but plant managers must still verify non-hazardous classification and recycling destination per shipment; feedstock aggregation economics improve only if waste streams meet Annex IIIB wording.

You're all caught up